Go back
Go back
TLD Flowline Mips Helmet - Orbit Forest Green -
TLD Flowline Mips Helmet - Orbit Forest Green -
TLD Flowline Mips Helmet - Orbit Forest Green -
TLD Flowline Mips Helmet - Orbit Forest Green -
50% off Sale Sold out

TLD Flowline Mips Helmet - Orbit Forest Green -

#125959043
$127.47
Regular price $254.95 Sale price $127.47
Choose an option
Checking stock source...
JS ASK JONNY’S TAKE
JS
Need a straight-up bike shop opinion?

Ask about sizing, setup, value, riding style or whether this product actually suits what you want to do.

PROFESSIONAL BUILD
Every Click and Collect bike will be fully assembled and safety-checked by a qualified Jonny Sprockets mechanic before you collect it. We check key bolts, gears, brakes, tyre pressure, headset, wheels and general setup, so your new bike is ready to roll properly from day one.
COVERED BY TROY LEE DESIGNS’S WARRANTY
Ride with confidence knowing this product is backed by Troy Lee Designs’s manufacturer warranty. If there’s a defect in materials or workmanship, we’ll help guide you through the warranty process and work with the supplier to get it sorted as quickly as possible. Warranty terms vary by brand and product type, but you’re not on your own if something genuine goes wrong. See warranty details

All The Deets

Description

The all-new Flowline Helmet is hand picked, literally, by the pros and for good reason. The Flowline Helmet features a combination of comfort, cool and signature TLD style. It's NTA-8776 certified, making it the perfect choice for any rider looking to hit their local trails or cruise the streets on their e-bikes.

SPECIFICATIONS

  • 3-Way adjustable screwless visor
  • MIPS B-Series Rotational Impact Brain Protection System
  • Full 360-degree fit retention system with 3-way rear height adjustment 
  • 14 vents for maximum airflow
  • Full wrap in-mold construction
  • Extended Coverage MTB Trail Helmet
  • Side strap adjusters 
Delivery & Shipping
  • Calculated at checkout
  • We ship daily, orders before 1pm often leave the same day.
  • Free shipping over $200 (excludes bulky items, such as- bikes, wheels, forks etc.)
  • Express options available on smaller items
10,000+

Bikes sold

Millions of Miles Ridden

#1

Expert advice

From our experienced team

LOCALS

SINCE 2012

Australian operated

20,000+

Bikes Repaired

and serviced

400+ GOOGLE REVIEWS

CUSTOMERS ARE STOKED

4.9 star rating

Recently viewed

You may also like